The special procurement key is allocated to the finished product or the assembly in the material master ( MRP 2 view).
In order to plan specific material requirements for each individual subcontractor, you can use MRP areas. You can thereby create an individual MRP area for every subcontractor
Main differences between S/4HANA and ECC.
ECC – with vendor segment
S/4HANA – without vendor segment
- Separate planning of every subcontractor is possible without having to create an MRP-area-specific material master record.
- The planning logic is simplified. There are two rather than three different ways to plan parts to be provided to a subcontractor.
- Create MRP areas for every subcontractor (can be done before or after upgrade)
- Run regenerative MRP after the upgrade
Subcontractor MRP area configuration
You can follow SAP navigation path or transaction code OMIZ directly to configure MRP areas.Click on New Entries and create MRP area as below.
After maintenance of MRP area click on double click on Subcontractor (one entry per MRP area) and maintain the vendor details as below.
Components Planning with Subcontracting Process
Master Data MRP Area
MRP area called SUB_001 available to plan separately associated components. SAP suggested maintaining the MRP area parameters to all components which are planned under the MRP area in MRP 1 view (Material R-100-101).Click on MRP areas and maintain the MRP parameters as like plant parameters.
It is important to maintain MRP 2 special procurement to 45 – Stock transfer from plant to MRP area.
Make a note that you need to adopt data while entering MRP area parameters and save material.
Subcontracting Process Execution
Demand Flow
Forecast updated for subcontracting header material called F-100-101.MRP Live
After forecast updated runs MRP live.Based on MRP live log total of 4 materials planned 1 material with classic MRP and another 3 with MRP on HANA.
Analyzing MRP results
After MRP run completed purchase requisitions created for header article based on planning horizon.Now go to component R-100-101 and analyze the result at a plant level and MRP area level.
Plant level – Stock transfer reservations from the plant to the provision stock of the subcontractor.
MRP area level – Procure the components that you provide to a subcontractor for the production of an assembly, by transferring stock from a plant to the MRP area of the subcontractor.
Mass maintenance
Mass processing reports RMMDDIBE and RMMDDIBE02 can be used for maintenance of MRP areas.Additional references:
https://launchpad.support.sap.com/#/notes/2586059https://launchpad.support.sap.com/#/notes/2227532
https://launchpad.support.sap.com/#/notes/2268044
https://launchpad.support.sap.com/#/notes/2516504
https://help.sap.com/viewer/fe39e10a9a864a8f8dc9537704f0fa13/1709%20000/en-US/60adce5314894208e10000000a174cb4.html
https://blogs.sap.com/2017/10/19/5-reasons-to-use-subcontracting-mrp-areas-in-s4hana./
Best Regards,
Lingaiah
Source: https://blogs.sap.com/2019/03/19/s4hana-subcontracting-with-mrp-area/
HOW TO CONFIGURATION PP PROCESS WITH EXAMPLE(PP MODULE)