Purpose:
The purpose of this article to understand the deconsolidation process perform in EWM during Goods receipt, where we received the mixed materials HU from one supplier and before placing the material to final destination we first open the HU received from supplier take out the different material from it and packed the materials into Individual HU before final placement.
We can use deconsolidation for single material received from supplier or mixed material received in one pallet.
In this scenario, I have picked different material received from supplier in one Big pallet.
Deconsolidation
The deconsolidation settings are divided in five parts as below:
- Define work center
- Define deconsolidation Attribute
- Consolidation group mapping and Number Range mapping
- Process oriented storage control Mapping
- Master Data settings
1) Define Work center for Deconsolidation (DEKO)
Deconsolidation work center is the place where all the incoming HU (mixed material HU or Single material HU or Large Material HU ( big in size) that need to be broken into small HU before final Put away.
SCM EWM →EWM→ Master Data → Work center→ Define work center
Define the work center (DEKO) : where the HU will be deconsolidated, define storage type, external step and Layout.
2. Deconsolidation Configuration (Attribute)
MaxD will help system to identify the number of warehouse task that Inbound HU can have beyond the number or exceeding the number the system will locate the HU to Deconsolidation Work center.
If the number of WT is lesser than the value defines in MaxD then system will not route the HU to Deconsolidation work center but directly put away the material based on put away strategy
MaxP the number of put way HU the system will create once the inbound HU is deconsolidated ( in Deconsolidate work center).
Path -> SPRO → EWM → Goods receipt process → Deconsolidation→ Define Attribute for Deconsolidation
SCM EWM → Goods receipt process → Deconsolidation→ Specify Deconsolidation Station
Maintain the warehouse, Source storage type and HU type group in combination of Work center. This combination is required so that system can identify where the HU needs to go after the inbound step is completed (if its meets above criterial MaxD, MaxP).
3. Consolidation Group Assignment
Assign consolidation group for Deconsolidation storage bin and final put away storage bin.
SCM EWM→ EWM → Master Data → Activity Area → Assign storage bin to activity area
Define Number range for Consolidation group
SCM EWM → Goods receipt process → Deconsolidation→ Assign Number Range interval to consolidate Group
Note:
- Do not forget to perform bin sorting (/n/SCWM/SBST) in case the setup for DECON (activity area, storage bin is new)
- Cross check the table if Consolidation group assignment is available in storage bin Table → /SCWM/LAGPS
4. Process Oriented Storage Control Mapping
SCM EWM → EWM → Cross process setting → Warehouse Task → Define process-oriented storage control
Go to process Oriented storage control tab and look for External step configuration settings related to DECON step IB02. Here activate the rule base config, were the system will search the storage bin based on the strategy and mapping done in Work center & under DECON attribute settings.
Assign Storage process INBG with warehouse process type and warehouse process type indicator and assign the Warehouse process type indicator in Product master.
Once system read the IB02 setting it will look for Work center where IB02 step settings are define and then based on the setting mention in the storage bin in combination of Storage type 8A10 and Inbound section – INBD, system will pick the storage bin -DECON.B
5. Master Data Setting :
Master data require for deconsolidation bin assignment with Work center→ /N/SCWM/TWORKST.
Process Flow:-
Step 1: create purchase order
Step 2: Create Inbound delivery: Perform packing during inbound delivery creation and delivery will be distributed to EWM.
Step 3: Access Inbound delivery in EWM and perform unloading. Tcode: /n/SCWM/IDN
Step 4: Perform UNLOADING using Unloading button
Step 5: System will create the Warehouse task to move the Stock/Hu from Doors to Goods receipt /Inbound (GR) area and another WT will be crate that will move the HU from GR Area to Deconsolidation Area -DEKO work center.
Go to Monitor using T-code : /n/SCWM/MON
Warehouse Order
Warehouse Task: The HU will be place in DECON.B bin after confirmation
Confirm the Warehouse task to move the material from Source BIN -123A to DECON.B bin. As of now the 2nd & 3rd line item of Warehouse task is set as ‘B’ → on hold, Once the DECON activity is done we can see the status changes from ‘B’ to ‘active’ for moving Decon HU to Final put away.
Step 6: Go to Deconsolidation Work center
Tcode /n/SCWM/DCONS
In selection screen enter the warehouse no and Work center ‘DEKO’ and execute or further filter it will possible options available on screen
In Decon Screen , select the possible destination HU tab , enter the packing material and enter the qty of HU that we want to be created to place/distribute the material and click on create button.
Generate the HU and place material from Big pallet to separate HU with required qty (for both material).
Step 7:Perform Complete HU process so that system will generate the Warehouse task to put away the HU’s to destination bin.
In Warehouse Monitor /n/SCWM/MON we can see that system has created the Warehouse task each for HU’s and the Status has been changed from ‘B-hold’ to Active.
Before HU step completion → The Warehouse task status
After HU step completion
Confirm the open warehouse task to move the material to final Destination bin.
Summary:
- The Deconsolidation process can be use in different putways process where one handling unit carrying mixed or single material can be break and packed into different handling unit depending upon warehouse HU settings and the packing specification maintained in system against the incoming material.
- The POSC will be used to perform different process step involved in Deconsolidation (like Unloading, Deconsolidation, Final put away).
- In EWM, deconsolidation should be triggered on following:
- If materials in HU belong to different activity area or different storage type and the final put away storage type are HU managed.
- Maximum number of warehouse task in the inbound HU is exceeded as define in system (Max D)
Regards
Nitin Solan
Source: https://blogs.sap.com/2020/01/06/sap-ewm-deconsolidation-process/