domingo, 18 de junho de 2023

New PMR quantity calculation method for 'Exact Quantity'- Customer Improvement

 SAP has now delivered a major standard solution in area of EWM Manufacturing integration for staging against PMR Items for both Single & Cross Orders. Now, customers can leverage the functionality of ''Staging Quantity'' as per PMR quantity for both Single & Cross Order items not from /SCWM/PSASTAGE table, a major breakthrough, which earlier was achieved using Badi for Staging.

This is achievable by SAP note-3321845 - Advanced Production Integration: Enhancement to Order-Based Quantity Calculation Type

Problem Statement-When using PMRs, we can define the qty calculation in the control cycles (/SCWM/PSASTAGE). However, there is no calculation method that takes the exact order quantities into account. Currently a customer own BAdI implementation is necessary.

Therefore, a SAP standard solution is highly needed to also have a new calculation method "exact quantities" available for single-order and cross-order staging methods. In cross-order staging all exact quantities need to be accumulated.

The note is applicable to1909 and + version. This note introduces a new calculation type in /SCMW/PSASTAGE table to stage quantity from PMR( Manufacturing Order)

No alt text provided for this image

Lets replicate the whole scenario how it works for PMR with single and cross order items

  • Crate manufacturing order with components having staging indicators as Single & Cross orders. Note-->S/4 does not know which components is single or cross order item, differentiation happens in SAP EWM based on Product or Product group combination from /SCWM/PSASTABE table.

Order 1000065 is created with 2 items.

No alt text provided for this image

  • Perform Staging with /SCWM/STAGE transaction. It crated 2 task in test mode, one for single & one for cross order item. Latter, I executed a real staging w/o test mode.

No alt text provided for this image


  • Check the PMR and Staging task created for Single Order item.

Staging task = PMR quantity=48 pcs. System read the new calculation method from /SCWM/PSASTAGE table.

No alt text provided for this image

  • Check the PMR and Staging task created for Cross Order item.

Staging task = PMR quantity=48 pcs. System read the new calculation method from /SCWM/PSASTAGE table for cross Order as well.

No alt text provided for this image

How to maintain PSA Stable table for this New Calculation Type?

Maintain the table as below for Cross Order. Its important to maintain Min Prod Qty as PSA and UOM and WPT, otherwise task will not be created.

No alt text provided for this image

Note--> For Cross Order, WPT is determined from /SCWM/PSASTAGE table not from configuration of WPT determination.

For single Order, maintain /SCWM/PSASTAGE table as below. Min qty and UOM is required. Its up to business how they decide to maintain min qty at PSA.

No alt text provided for this image

How system cumulates quantity for against Manufacturing Orders for Cross Order Items?

No alt text provided for this image

Perform the staging against 96 PCS for 2 cross items. System created task per expectation. 2 task for 48 PCs for each Cross Order items

No alt text provided for this image

Definitely, this is booster for customers whose production staging model is per Manufacturing Order, not from Min Max Table. This is somewhat hybridization of delivery based integration model now.

Thanks for reading. All tests have been performed in S/4 HANA 20222 Embedded EWM Sandbox system.

Source: https://www.linkedin.com/pulse/new-pmr-quantity-calculation-method-exact-quantity-customer-mishra/?utm_source=share&utm_medium=member_ios&utm_campaign=share_via

Nenhum comentário:

Postar um comentário