Overview
The purpose of this blog is to plan a transition from conventional SAP ERP system to SAP S/4 HANA. SAP Readiness check for SAP S/4HANA assists customers with planning and preparation activities necessary to convert an SAP ECC system to SAP S/4HANA. SAP Readiness Check for SAP S/4HANA supports SAP ERP 6.0 (Enhancement Package 0 to 8) and SAP S/4HANA Finance 1504 and 1605.
Benefit
- Improved analysis report.
- Better prepare for the transition to SAP S/4HANA with optimized business processes.
- Identify potential improvement.
- Filter on mandatory activities to ease project planning
- Customers can upload the detailed consistency heck results to deep dive into results online
- All project phases activities are sequenced and categorized (mandatory, conditional or optional)
Prerequisites
- TCI should be enabled.
- ST-PI patch should be latest.
- If SNote 2310438 and another dependent note has been implemented before then we need to de-implement those SNote.
- APIs are required to run SAP Readiness Check for SAP S/4HANA. To install these supporting APIs we need to implement below SAP Note.
Process Steps
Step1:
Step2:
Select all scope selection for Discover Phase. Ensure not to select Simplification Item Consistency available under Scope selection for plan phase.
Step3:
Step4:
Step5:
Launch the link: https://rc.cfapps.eu10.hana.ondemand.com and use the ZIP file that was generated in step4. To create a new analysis, click Create New Analysis.
Hope the reading was helpful to understand the key concept of SAP Readiness Check for SAP S/4HANA. Thanks for your time and share your valuable comments or queries. More than happy to answer!!
Hope this blog post will be helpful!!
Note:
Please refer help.sap.com for reference content in this regard.